WEEK 5 • ACTIVE RENOVATION

Paws in
Progress

Build the schedule, record every dollar and keep the right work moving—even when the project throws you a curve.

Schedule ItTrack ItKeep It Moving
Start the lesson ↓

TODAY’S MISSION

Turn the plan into controlled progress.

Week 4 gave you the crew and contracts. Now Flip and Cash will help you decide what happens first, build dependencies in FlipperForce, document actual costs and measure work that is truly complete—not merely paid for.

Your project begins at the permit counter—not with demolition. Identify the authority having jurisdiction (AHJ), confirm exactly what the scope triggers and obtain approvals before regulated work begins.

  1. Confirm jurisdiction.Call the municipality or its certified third-party agency. Ask about zoning, historic review and trade permits.
  2. Define the scope.Prepare applications, drawings, contractor information, values and specifications requested by the AHJ.
  3. Submit and respond.Track plan-review comments and revisions. Do not assume submission equals approval.
  4. Post and inspect.Keep permits available, schedule required inspections before covering work and document each result.
  5. Close the file.Complete finals and obtain any required Certificate of Occupancy or Use & Occupancy approval.

Common permits to investigate

Building / Alteration

Structural changes, additions, framing, stairs, egress and many substantial renovations.

Demolition

Structural demolition or full removal; selective interior demo rules vary locally.

Electrical

Service, panels, new circuits, rewiring, devices and other regulated electrical work.

Plumbing

New or relocated supply, drain, vent, fixtures, water heaters and sewer work.

Mechanical / HVAC

Heating, cooling, ductwork, gas piping and equipment changes where regulated.

Roof / Windows / Exterior

Roofing, window openings, siding and exterior repairs when separately regulated.

Zoning / Historic

Footprint, use, setbacks, exterior changes, signs or work in a historic district.

Utility / Site

Water, sewer, septic, wells, grading, driveways, dumpsters or right-of-way use.

Occupancy / Closeout

Final inspections and any Certificate of Occupancy or Use & Occupancy requirement.

Permit costs are local. Fees may use a base charge, project value, square footage, fixtures or devices, plan review, inspections, surcharges and expedited review. Copy the current formula from your AHJ’s published fee schedule—never rely on an old project.

INTERACTIVE PRACTICE

Permit Fee Builder

Educational estimator only. Enter the current figures supplied by the issuing authority.

Planning estimate$0